Exactly how your battery is fitted ⎯ each stage shown as a simple diagram.
A sturdy bracket is fixed to a shaded, ventilated wall.
The battery is lifted onto the bracket and secured.
A hybrid inverter is mounted and linked to the battery.
DC/AC cabling is run to the switchboard; isolators fitted.
Rooftop solar and the grid are tied in for charging.
Tested, safety-checked and the monitoring app is set up.